Construction
The construction and assembly of the pruning device will be carried out, locally to Central Washington University. As the project schedule shows, manufacturing will be completed over the following time period of Jan. 4 - March 16. The schedule is presented in a chronological fashion.
![](https://static.wixstatic.com/media/b38cae_3c8453a37ed344dc92777fa7953e928c~mv2.png/v1/fill/w_600,h_336,al_c,q_85,usm_0.33_1.00_0.00,enc_auto/b38cae_3c8453a37ed344dc92777fa7953e928c~mv2.png)
Neil Hauff is credited with the manufacture of the flat plate shapes. An Abrasive Jet Machine (AJM) or Laser cutting device punched the outlines. And, the hole centers were etched for drill/tap/ream secondary processes.